What tests do rough tablets need to pass before they leave the factory?

The reason why rough tablet gets its name is that it can meet the application requirements of industrial field in harsh environment, such as dust-proof, waterproof, anti-static, width, wide pressure and other problems. The rough tablets are also different from ordinary computers, mainly because the environment and performance requirements are different.

1. The installation and standard production of rough tablet:

In the process of installing production line of rough tablet, it is necessary to strictly control every link of production. This requires rough tablet manufacturers have a standardized production workshop, in order to strictly control the production process.

2. The IP industrial-grade dust-proof and waterproof test of rough tablet:

The rough tablet is mostly used in industrial, outdoor dusty, water use environment, which requires the product to have dust-proof and waterproof performance. Therefore, the finished product needs to pass the industrial IP67 waterproof and dust-proof test to ensure the use of special application scenarios.

3. Wide temperature operation test of rough tablet:

Because the rough tablet will be used in high and low temperature, dust, water, oil and other harsh environment, only after the product passes the controlled high temperature, constant temperature and humidity test, can the performance be more stable in the harsh use environment.
4. ESD anti-static test of rough tablet:
Through checking the interface end which is to contact 6KV electrostatic test one by one, ensure that the interface end can be energized, so as to ensure the normal operation of the whole machine product.

5. The vibration test and horizontal drop test of rough tablet:

A qualified rough tablet will also experience simulated car vibration and drop test, which not only can avoid the damage to product in the process of transportation due to collision, but also can prevent the product damage due to fall in the process of use.
6. Power consumption test of rough tablets:
After that, qualified rough tablet products will also go through 48 hours of aging test. In the aging room, all products will be turned on for 48 hours uninterrupted for display detection with real-time data recording, to ensure that each finished product meets qualified use standards, and to achieve the purpose of reducing the production rate.

Share:

More Posts

Send Us A Message